Q-Ready · Evidence mapping
Evidence, organised the way assessors ask for it.
19 compliance evidence packs map Q-Ready findings to post-quantum standards and national, sector and industry frameworks. They are self-assessments that support your assessment; they do not certify.

Mapping
What Q-Ready maps evidence to.
Nineteen packs, grouped by the kind of framework.
Post-quantum standards
| Framework | Its focus | Evidence Q-Ready maps |
|---|---|---|
| NIST IR 8547 and FIPS 203, 204, 205 | Transition to ML-KEM, ML-DSA and SLH-DSA | Quantum-vulnerable public-key use, approved replacements and hybrid deployment |
| NSA CNSA 2.0 | Algorithm suite for national-security systems | Algorithms and parameter sets in use against the suite, including signing |
National and regional guidance
| Framework | Its focus | Evidence Q-Ready maps |
|---|---|---|
| CERT-In SBOM, QBOM and CBOM guidelines | Bills of materials for software and cryptography | CycloneDX 1.6 CBOM and supporting inventory |
| India DST quantum-safe task force | Cryptographic asset repository and migration readiness | Inventory, risk assessment and hybrid deployment evidence |
| EU coordinated PQC roadmap | Coordinated transition planning | Inventory, risk assessment and the migration plan |
| UK NCSC PQC timelines | Migration milestones | Discovery, the migration plan and waves against milestones |
| US CISA and OMB inventory guidance | Automated cryptographic discovery and inventory | Automated and network-level discovery, prioritised systems |
| MAS quantum advisory | Inventory and classification | Algorithm, key length, owner and system for each asset |
Sector and data-protection frameworks
| Framework | Its focus | Evidence Q-Ready maps |
|---|---|---|
| PCI DSS 4.0, requirement 12.3.3 | Review of cipher suites and protocols in use | Cipher-suite and protocol inventory |
| ISO/IEC 27001, control A.8.24 | Use of cryptography | Cryptographic inventory, key records and policy results |
| NIST CSF 2.0 | Asset inventory and data security | Inventory and SBOM-to-CBOM correlation |
| RBI crypto controls | Cryptographic controls for regulated entities | CBOM and crypto-agility assessment |
| SEBI CSCRF crypto controls | Cryptographic controls for market entities | Inventory, prioritised assets and post-quantum risk |
| DPDP Act | Reasonable security safeguards for personal data | Evidence of encryption in use and planned upgrades |
| DORA (RTS 2024/1774, Art. 6–7) | Encryption and key-lifecycle controls | Policy results and a cryptographic key register |
Industry frameworks
| Framework | Its focus | Evidence Q-Ready maps |
|---|---|---|
| GSMA PQ.03 and ETSI TR 103 619 | Telecom post-quantum migration | IPsec, IKE and TLS inventory, and the migration plan |
| IEC 62443-3-3 SR 4.3 and NERC CIP | Cryptography in industrial control systems | Device firmware and protocol cryptography |
| FDA premarket guidance and HIPAA | Medical-device and health-data security | Cryptography in SBOMs and encryption of health data |
| UNECE R155 and ISO/SAE 21434 | Vehicle cybersecurity | Firmware cryptography and supplier evidence |
Evidence packs
Hand over a pack, not a spreadsheet.
Evidence per control
Each requirement shows evidence available, partial or not verified, with the findings behind it.
Gaps in plain language
Ask Q-Ready summarises the gaps with citations. Requirements are paraphrased, so check the original text.
Policy gate
A policy-as-code result sits beside the evidence, with blocking rules and approved exceptions.

What this is not
Support for assessment, not a certificate.
No certification is claimed. No certification, empanelment or regulatory compliance is claimed for Q-Ready. The compliance evidence packs are self-assessments that map evidence to controls to support your assessment; they do not certify.
Next step
Request a Q-Ready briefing.
Walk through the evidence with a Knowlcom team.
